A 3D energy model of our VURB project at Hillwood

Hillwood

Through VURB pathway, glazing cost was reduced by increasing U-value from U3.3 to U3.6. This was achieved by adding 30% more insulation to the walls and 14% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:59+00:00

Westwood

Adding 50mm rigid insulation to the slab and filling ceiling and wall void spaces with insulation, we managed to increase overall window U-values from U2.0 to U3.8 and significantly save construction costs.

2025-01-30T08:37:47+00:00

Tuerong

With Deemed to Satisfy provisions and adjustable shading devices we managed to increase the overall U-values from U2.1 to U2.4 (a 15% increase).