
Kyneton
Through JV3 modelling, construction cost was reduced by keeping new walls from new works (insulation). This was done by decreasing averaged U value from U5.5 to U4.8 and by adding 20% more insulation to the roof/ceiling.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-30T04:04:28+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2