Project Description
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2. This was achieved by adding 47% more insulation to the floors and 36% more insulation to the ceilings.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Matin2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Matin2022-01-24T22:59:27+00:00
Surry Hills-DL
Through daylight modelling, the building achieved compliance with the Green Star Minimum Expectations