3D model of our JV3 project at Promised Land

Promised land

Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2. This was achieved by adding 47% more insulation to the floors and 36% more insulation to the ceilings.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-01-30T03:18:25+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).