Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U4.0 to U3.9 and by adding 120% more insulation to the ceiling.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:29:08+00:00
Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation
Amir2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).