Project Description
Southbank
Through JV3 modelling, construction cost was reduced by keeping the existing curtain wall system from new works (replacement), while keeping the new curtain wall system to be tinted.
This was done by decreasing the average U-value from U5.3 to U3.0 and by adding 85% more insulation to the walls and 25% more insulation to the ceilings.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Matin2022-02-13T21:38:35+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2
Matin2022-02-13T21:29:08+00:00
Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation