Penguin

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by decreasing averaged U value from U5.7 to U4.4 and by adding 120% more insulation to the walls.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2022-02-13T21:31:41+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).