Narre Warren

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-01-30T03:18:25+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).

2023-03-08T03:19:42+00:00

Newtown

By implementing passive solutions, we get to improve thermal comfort by 24%, achieving PMV between -2 and +2 for 93% of the operating hours.