Narre Warren

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-03-08T03:19:42+00:00

Newtown

By implementing passive solutions, we get to improve thermal comfort by 24%, achieving PMV between -2 and +2 for 93% of the operating hours.

2023-06-19T08:08:49+00:00

Prospect

For this Development project located in the cold region of Tasmania, we managed to cost-effectively achieve energy compliance through the JV3 Performance Solution pathway.

2025-03-05T04:22:37+00:00

St Helen

Through JV3, we managed to save a great deal of required thermal energy to heat the eatery, bar area and cinema while keeping some existing services.