Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Amir2023-02-14T04:13:25+00:00
Surry Hills
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).