Narre Warren

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2022-02-13T21:31:41+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).

2022-12-23T08:55:49+00:00

Sherwood

Through JV3 assessment, we were able to obtain energy compliance for the new extension by adding minimum 1kW solar PV to the proposed building.