Narre Warren

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2022-02-13T21:31:41+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).

2023-06-19T08:08:49+00:00

Prospect

For this Development project located in the cold region of Tasmania, we managed to cost-effectively achieve energy compliance through the JV3 Performance Solution pathway.