Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:38:35+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2
Amir2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Amir2023-06-19T08:58:34+00:00
Somerville
Single-glazing windows were enough to keep the proposed building facades reaching a maximum U-value of 2.0 as required by the NCC