Kyneton

Through JV3 modelling, construction cost was reduced by keeping new walls from new works (insulation). This was done by decreasing averaged U value from U5.5 to U4.8 and by adding 20% more insulation to the roof/ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2022-02-13T21:31:41+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).