
Tyabb
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U value from U4.4 to U3.7 and by adding 100% less insulation to the walls and 125% more insulation to the ceilings.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-30T04:04:28+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2
Amir2025-03-05T04:33:11+00:00
Surry Hills
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).