Tyabb
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U value from U4.4 to U3.7 and by adding 100% less insulation to the walls and 125% more insulation to the ceilings.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:13:25+00:00
Surry Hills
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Amir2023-06-19T08:58:34+00:00
Somerville
Single-glazing windows were enough to keep the proposed building facades reaching a maximum U-value of 2.0 as required by the NCC
Amir2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).