Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U value from U4.4 to U3.7 and by adding 100% less insulation to the walls and 125% more insulation to the ceilings.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2022-12-23T08:55:49+00:00

Sherwood

Through JV3 assessment, we were able to obtain energy compliance for the new extension by adding minimum 1kW solar PV to the proposed building.

2023-03-08T08:30:03+00:00

St Helen

Through JV3, we managed to save a great deal of required thermal energy to heat the eatery, bar area and cinema while keeping some existing services.