Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by decreasing averaged U value from U5.7 to U4.4 and by adding 120% more insulation to the walls.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:32:07+00:00
Templestowe
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Amir2022-02-13T21:38:35+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2