Bullengarook
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.6 to U3.9. This was done by adding 37% more insulation to the roof/ceiling, R1.5 under-slab and slab edge insulation and R2.5 internal wall insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater
matin2024-06-12T08:47:12+00:00
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater