Pakenham

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.5 to U3.2. This was done by adding 20% more insulation to the walls, 37% more insulation to the roof/ceiling, proposed shading devices and R1.2 slab insulation to parts of the building.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below: