Devonport
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows from being replaced. This was done by adding 37% more insulation to the roof/ceiling, 45% more insulation to the external floor, slab edge insulation and roof blankets.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Carlton North
Through daylight modelling, the building owner's claim regarding the overshadowing of the proposed neighbouring building is validated.
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater