Connewarre

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.2 to U2.9.
This was done by adding 23% more insulation to the roof/ceiling and walls, R0.8 to the concrete slab and 2 adjustable shading devices.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-14T04:28:05+00:00

Tuerong

With Deemed to Satisfy provisions and adjustable shading devices we managed to increase the overall U-values from U2.1 to U2.4 (a 15% increase).