Flinders
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.0 to U3.4.
This was done by adding 10% more insulation to the roof/ceiling, 5% more insulation to the external floor, walls and 3 shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater
Amir2023-02-14T04:14:40+00:00
Middle Tarwin
Through VURB, overall window U-values increased from U2.3 to U2.9. Also, feasibility study showed best results for bore water geothermal.