Flinders
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.0 to U3.4.
This was done by adding 10% more insulation to the roof/ceiling, 5% more insulation to the external floor, walls and 3 shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:27:58+00:00
Hopetoun Park
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.1 to U2.4
Amir2023-01-03T09:08:30+00:00
Gravelly Beach
Through VURB, we were able to obtain energy compliance for the proposed new dwelling with U3.1 instead of U2.0
Amir2023-02-14T04:14:40+00:00
Middle Tarwin
Through VURB, overall window U-values increased from U2.3 to U2.9. Also, feasibility study showed best results for bore water geothermal.




