Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.0 to U3.4.
This was done by adding 10% more insulation to the roof/ceiling, 5% more insulation to the external floor, walls and 3 shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
matin2024-06-12T08:47:12+00:00
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater