Flinders

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.0 to U3.4.
This was done by adding 10% more insulation to the roof/ceiling, 5% more insulation to the external floor, walls and 3 shading devices.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-14T03:01:10+00:00

Legana

In this project, using our solutions the client managed have overall Window U-value of U3.4 instead of U2.6 (more than a 30% increase).