Project Description
Elwood
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.6 to U3.3.
This was done by adding 50% more insulation to the roof/ceiling, 23% more insulation to the external walls, slab edge insulation, 3 shading devices and minor changes to the building design.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Matin2022-02-13T21:37:55+00:00
Mornington
Through VURB pathway, glazing cost was reduced by increasing U-value from U1.9 to U2.5
Matin2022-02-13T21:26:01+00:00
Carlton North
Through daylight modelling, the building owner's claim regarding the overshadowing of the proposed neighbouring building is validated.