Hopetoun Park
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.1 to U2.4. This was done by adding 20% more insulation to the walls and ceilings, proposed shading devices and minor slab insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-23T04:14:07+00:00
Lysterfield
Through VURB pathway, glazing cost was reduced by increasing averaged U value from U2.6 to U2.7.
Amir2023-02-14T04:15:57+00:00
Devonport 2
Through VURB pathway, we managed to have an overall U-value of U3.9 instead of 3.3 (5.6 stars from NatHERS)
matin2024-06-12T08:47:12+00:00
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater




