Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:14:40+00:00
Middle Tarwin
Through VURB, overall window U-values increased from U2.3 to U2.9. Also, feasibility study showed best results for bore water geothermal.
Amir2025-01-30T02:18:17+00:00
Mornington
Through VURB pathway, glazing cost was reduced by increasing U-value from U1.9 to U2.5