St Kilda
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-30T04:16:27+00:00
Nulla Vale
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.7
Amir2025-01-23T04:14:07+00:00
Lysterfield
Through VURB pathway, glazing cost was reduced by increasing averaged U value from U2.6 to U2.7.
Amir2022-02-13T21:27:58+00:00
Hopetoun Park
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.1 to U2.4
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater