Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U value from U4.4 to U3.7 and by adding 100% less insulation to the walls and 125% more insulation to the ceilings.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below: