Torquay
Through the Elemental approach, Torquay project upper floor glazing required U-value is calculated to be U1.29. Through VURB, The upper floor glazing area could be kept the same as architectural plans without a significant increase in glazing costs. We managed to obtain energy compliance for the glazing with an average U-value of 2.45.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-06-19T05:24:26+00:00
South Windsor
We were assigned to this project to investigate whether the project's bedrooms achieve adequate daylight access
Amir2022-02-13T21:37:15+00:00
Claude Road
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.8 to U3.5