Armadale

Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U4.0 to U2.0 and by adding 25% more insulation to the walls and 6% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:33+00:00

Marengo

After several iterations for optimisation, we managed to increase the overall U-values from U2.7 to U3.8 (a 40% increase).

2023-02-14T06:47:54+00:00

Newham

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.4 to U3.0