Bullengarook
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.6 to U3.9. This was done by adding 37% more insulation to the roof/ceiling, R1.5 under-slab and slab edge insulation and R2.5 internal wall insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:15:57+00:00
Devonport 2
Through VURB pathway, we managed to have an overall U-value of U3.9 instead of 3.3 (5.6 stars from NatHERS)
Amir2023-03-08T08:02:27+00:00
North Melbourne
Through VURB, we were able to achieve compliance by having windows with an overall U-value of U3.3 (a 27% increase)