3D sample of our VURB project at Devonport

Devonport

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows from being replaced. This was done by adding 37% more insulation to the roof/ceiling, 45% more insulation to the external floor, slab edge insulation and roof blankets.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:59+00:00

Westwood

Adding 50mm rigid insulation to the slab and filling ceiling and wall void spaces with insulation, we managed to increase overall window U-values from U2.0 to U3.8 and significantly save construction costs.