Mornington
Through VURB pathway, glazing cost was reduced by increasing U-value from U1.9 to U2.5. This was achieved by adding 33% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:13:38+00:00
Porcupine Ridge
Using VURB pathway, we managed to reduce overall glazing U-values from U2.1 to U2.7