Frankson project of Energy Compliance Consultants

Frankston

Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.3. This was achieved by adding 33% more insulation to the walls and 40% more insulation to the suspended floors.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-01-30T03:21:53+00:00

Devonport

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows.

2024-06-12T08:35:54+00:00

Ryde

The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater