Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.3. This was achieved by adding 33% more insulation to the walls and 40% more insulation to the suspended floors.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-08-25T07:19:56+00:00
Bullengarook
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.6 to U3.9.
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater
Amir2023-06-19T05:24:26+00:00
South Windsor
We were assigned to this project to investigate whether the project's bedrooms achieve adequate daylight access