Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.3. This was achieved by adding 33% more insulation to the walls and 40% more insulation to the suspended floors.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-23T04:14:07+00:00
Lysterfield
Through VURB pathway, glazing cost was reduced by increasing averaged U value from U2.6 to U2.7.
Amir2025-01-30T08:20:19+00:00
Bell Buoy Beach
Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5.
matin2024-06-12T08:47:12+00:00
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater