Narre Warren

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-03-05T04:10:39+00:00

Sherwood

Through JV3 assessment, we were able to obtain energy compliance for the new extension by adding minimum 1kW solar PV to the proposed building.

2023-02-14T04:14:04+00:00

Southbank

Through JV3 assessment, the proposed building existing curtain walls were kept from changing and also, new curtain walls were kept clear with high SHGC

2023-06-19T08:08:49+00:00

Prospect

For this Development project located in the cold region of Tasmania, we managed to cost-effectively achieve energy compliance through the JV3 Performance Solution pathway.