Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by adding 20% more insulation to the walls and ceiling.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-30T04:04:28+00:00
Promised land
Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2