VURB

Pakenham

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.5 to U3.2. This was done by adding 20% more insulation to the walls, 37% more insulation to the roof/ceiling, proposed shading devices and R1.2 slab insulation to parts of the building.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-10T02:17:49+00:00

Selby

Through VURB and with a minor amendment, we managed to increase the overall U-values from U3.0 to U3.9 (more than a 30% increase).

2024-06-12T08:35:54+00:00

Ryde

The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater

2025-01-30T08:37:47+00:00

Tuerong

With Deemed to Satisfy provisions and adjustable shading devices we managed to increase the overall U-values from U2.1 to U2.4 (a 15% increase).