Promised land

Through JV3 modelling, glazing cost was reduced by increasing averaged U-value from U4.5 to U5.2. This was achieved by adding 47% more insulation to the floors and 36% more insulation to the ceilings.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-03-05T04:22:37+00:00

St Helen

Through JV3, we managed to save a great deal of required thermal energy to heat the eatery, bar area and cinema while keeping some existing services.

2025-01-30T03:18:25+00:00

Tyabb

Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).

2023-02-14T04:14:04+00:00

Southbank

Through JV3 assessment, the proposed building existing curtain walls were kept from changing and also, new curtain walls were kept clear with high SHGC