Research
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.8 to U3.1. This was done by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices and slab insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-23T03:55:25+00:00
Blairgowrie
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.6.
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater
Amir2023-02-14T04:15:57+00:00
Devonport 2
Through VURB pathway, we managed to have an overall U-value of U3.9 instead of 3.3 (5.6 stars from NatHERS)