Research
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.8 to U3.1. This was done by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices and slab insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:13:38+00:00
Porcupine Ridge
Using VURB pathway, we managed to reduce overall glazing U-values from U2.1 to U2.7
Amir2022-02-13T21:54:04+00:00
Bell Buoy Beach
Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5.