Research
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.8 to U3.1. This was done by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices and slab insulation.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:27:58+00:00
Hopetoun Park
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.1 to U2.4
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater




