St Kilda

Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-14T03:01:10+00:00

Legana

In this project, using our solutions the client managed have overall Window U-value of U3.4 instead of U2.6 (more than a 30% increase).

2022-02-13T21:24:44+00:00

Devonport

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows.