St Kilda
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-08-25T07:19:56+00:00
Bullengarook
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.6 to U3.9.
Amir2023-02-14T04:13:38+00:00
Porcupine Ridge
Using VURB pathway, we managed to reduce overall glazing U-values from U2.1 to U2.7
Amir2022-02-13T21:26:01+00:00
Carlton North
Through daylight modelling, the building owner's claim regarding the overshadowing of the proposed neighbouring building is validated.