3D model of our energy compliance project at St Kilda

St Kilda

Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing averaged U value from U3.8 to U2.4 and by adding 12% more insulation to the walls and 6% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:59+00:00

Westwood

Adding 50mm rigid insulation to the slab and filling ceiling and wall void spaces with insulation, we managed to increase overall window U-values from U2.0 to U3.8 and significantly save construction costs.