
Stawell
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U value from U6.0 to U2.6. and by adding no more insulation to the ceilings.
Please click here for more details on JV3 Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2025-01-30T08:44:44+00:00
Surry Hills
Through JV3 modelling, construction cost was reduced by keeping existing walls from new works (insulation).
Amir2022-02-13T21:29:08+00:00
Narre Warren
Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation