Penguin

Through JV3 modelling, construction cost was reduced by keeping the concrete slab from any added insulation. This was done by decreasing averaged U value from U5.7 to U4.4 and by adding 120% more insulation to the walls.

Please click here for more details on JV3 Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-03-08T08:30:03+00:00

St Helen

Through JV3, we managed to save a great deal of required thermal energy to heat the eatery, bar area and cinema while keeping some existing services.

2023-03-08T03:19:42+00:00

Newtown

By implementing passive solutions, we get to improve thermal comfort by 24%, achieving PMV between -2 and +2 for 93% of the operating hours.