Connewarre

Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.2 to U2.9.
This was done by adding 23% more insulation to the roof/ceiling and walls, R0.8 to the concrete slab and 2 adjustable shading devices.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:59+00:00

Westwood

Adding 50mm rigid insulation to the slab and filling ceiling and wall void spaces with insulation, we managed to increase overall window U-values from U2.0 to U3.8 and significantly save construction costs.