Armadale
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U4.0 to U2.0 and by adding 25% more insulation to the walls and 6% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-05-11T01:34:26+00:00
Connewarre
Through VURB pathway, construction cost was reduced by increasing average window U-values from U2.2 to U2.9
Amir2023-02-14T04:13:38+00:00
Porcupine Ridge
Using VURB pathway, we managed to reduce overall glazing U-values from U2.1 to U2.7
Amir2025-01-30T08:20:19+00:00
Bell Buoy Beach
Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5.