3D model of our VURB assessment project at Bell Buoy Beach

Bell Buoy Beach

Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5. This was achieved by adding 38% more insulation to the walls and 26% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-02-10T02:52:44+00:00

Elwood

Through VURB pathway, we were able to have an overall U-value of U3.5 instead of 3.0 (6 stars from NatHERS).

2025-01-30T03:21:53+00:00

Devonport

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows.

2023-02-14T03:01:10+00:00

Legana

In this project, using our solutions the client managed have overall Window U-value of U3.4 instead of U2.6 (more than a 30% increase).