Project Description
Bell Buoy Beach
Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5. This was achieved by adding 38% more insulation to the walls and 26% more insulation to the ceilings.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Matin2022-02-13T21:38:25+00:00
Nulla Vale
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.0 to U2.7
Matin2022-02-13T21:26:01+00:00
Carlton North
Through daylight modelling, the building owner's claim regarding the overshadowing of the proposed neighbouring building is validated.