Project Description

Bell Buoy BeachGlazing cost was reduced by increasing U value from 3.0 to 3.5. This was achieved by adding 38% more insulation to the walls and 26% more insulation to the ceilings.

Proposed residential dwelling (class 1a) is located in the city of Bell Buoy Beach. It consists of 3 levels with a net area of 160m2.

Through VURB method we managed to reduce overall glazing U-value by more than 15%.

Here are some more details on the degree of insulation and glazing thermal performance for the Bell Buoy Beach project:

Item NCC 2016 Reference Building Proposal Building
Floor R2.12 added to all suspended floors and common floors
No insulation added to the slab on ground
R3.0 added to all suspended floors and common floors
No insulation added to the slab on ground
Internal and common walls No insulation added to the internal walls
R2.41 added to the common walls
No insulation added to the internal walls
R3.0 added to the common walls
External walls R2.17 added to the external walls
Solar absorptance: 0.6
R3.2 added to all external blockwork walls
Solar absorptance: 0.6
R2.7 added to all external lightweight clad walls
Solar absorptance: 0.6
Roof/Ceiling R4.74 added to the ceilings of all external roofs
Solar absorbance: 0.6
R6.0 added to the ceilings of all external roofs
Solar absorbance: 0.6
External shading Shading from other buildings and external eaves have been implemented into the analysis based on available drawings. No new shadings proposed
Glazing All ground floor east & west facing windows:
U-Value: 3.0, SHGC:0.10
All other ground floor windows:
U-Value: 3.6, SHGC: 0.81
All first floor windows:
U-Value: 1.75, SHGC:0.28
Sliding Doors:
U-Value 3.1, SHGC 0.47
Fixed Window:
U-Value 2.7, SHGC 0.51
Awning windows:
U-Value 4.7, SHGC0.47