Bell Buoy Beach

Through VURB pathway, glazing cost was reduced by increasing U-value from U3.0 to U3.5. This was achieved by adding 38% more insulation to the walls and 26% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:59+00:00

Westwood