
Balaclava
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2023-02-14T04:15:57+00:00
Devonport 2
Through VURB pathway, we managed to have an overall U-value of U3.9 instead of 3.3 (5.6 stars from NatHERS)
Amir2025-01-23T04:14:07+00:00
Lysterfield
Through VURB pathway, glazing cost was reduced by increasing averaged U value from U2.6 to U2.7.



