Balaclava
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-08-25T07:19:56+00:00
Bullengarook
Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.6 to U3.9.
Amir2023-02-10T02:54:34+00:00
Keysborough
Through VURB, we were able to obtain energy compliance for the proposed new dwelling with U3.2 instead of U2.2