
Balaclava
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Middle Tarwin
Through VURB, overall window U-values increased from U2.3 to U2.9. Also, feasibility study showed best results for bore water geothermal.
Keysborough
Through VURB, we were able to obtain energy compliance for the proposed new dwelling with U3.2 instead of U2.2
South Windsor
We were assigned to this project to investigate whether the project's bedrooms achieve adequate daylight access
Kogarah bay
The main BASIX commitments included high-efficiency cooling system, rainwater tank, water-efficient fixtures and heat pump water heater