Balaclava
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
Amir2022-02-13T21:26:01+00:00
Carlton North
Through daylight modelling, the building owner's claim regarding the overshadowing of the proposed neighbouring building is validated.
Amir2025-01-30T02:15:37+00:00
Claude Road
Through VURB pathway, glazing cost was reduced by increasing U-value from U2.8 to U3.5