A 3D model of our energy modelling project at Claude Road

Claude Road

Through VURB pathway, glazing cost was reduced by increasing U-value from U2.8 to U3.5. This was achieved by adding 33% more insulation to the walls and 20% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2025-01-30T03:21:53+00:00

Devonport

Through VURB pathway, construction cost was reduced by increasing average window U-values from U3.3 to U3.9 while keeping the existing windows.