3D model of our VURB project at Fingal

Fingal

Through VURB pathway, glazing cost was reduced by increasing U-value from U3.2 to U3.5. This was achieved by adding 38% more insulation to the walls and 37% more insulation to the ceilings.

Please click here for more details on VURB Performance Solution.

Feel free to navigate through dozens of our similar projects below:

2023-06-19T05:23:33+00:00

Marengo

After several iterations for optimisation, we managed to increase the overall U-values from U2.7 to U3.8 (a 40% increase).