
Balaclava
Through VURB pathway, construction cost was reduced by keeping existing walls from new works (insulation). This was done by decreasing the average U-value from U2.5 to U1.6 and by adding 20% more insulation to the walls, 35% more insulation to the ceilings and proposed shading devices.
Please click here for more details on VURB Performance Solution.
Feel free to navigate through dozens of our similar projects below:
matin2024-06-12T08:36:34+00:00
Seven hills
The main BASIX commitments included solar PV, rainwater tank, water-efficient fixtures, pool cover and heat pump water heater